CORRIGENDUM – Methodology for the selection of project files submitted for the preparation of technical-economic documentation

CORRIGENDUM – Methodology for the selection of project files submitted for the preparation of technical-economic documentation - Applicant's Guide - specific conditions for accessing funds from POAT 2014 - 2020

Applicant's GuideSpecific conditions for accessing funds from Technical Assistance Operational Program 2014 – 2020 intended for the preparation of infrastructure projects in the fields of urban mobility, urban regeneration, road infrastructure of county interest, including detours and/or connecting roads, leisure centers/tourist bases (school camps) and public tourism infrastructure and services, including heritage sites with tourism potential

EMERGENCY ORDINANCE no. 88 of May 27, 2020 regarding the establishment of measures, as well as the granting of financial support for the preparation of the portfolio of projects in strategic areas considered priority for the programming period 2021-2027, intended for financing through the Technical Assistance Operational Program 2014-2020 (POAT 2014-2020) and Large Infrastructure Operational Program 2014-2020 (POIM)

According to the provisions of GEO no. 88/2020 regarding the establishment of measures and the granting of financial support for the preparation of the portfolio of projects in strategic areas considered priority for the programming period 2021-2027, intended for financing through the Technical Assistance Operational Program 2014-2020 (POAT 2014-2020) and the Infrastructure Operational Program Mare (POIM), MFE, through AM POAT, will grant financial support for the preparation of projects of strategic importance, in the following 5 fields:

a) Urban mobility;

b) Urban regeneration

c) Road infrastructure of county interest, including detours and/or connecting roads;

d) Leisure centers / tourist bases / school camps;

e) Public tourism infrastructure and services, including heritage sites with tourism potential.

Find below the project sheets in editable format to facilitate their completion.

Appendix 1.1_Model Investment_project_file Road infrastructure of county interest, including detours

Appendix 1.2_Model Investment_project_file Urban mobility

Appendix 1.3_Model Investment_project_file Urban regeneration

Annex 1.4_Model Investment_project_file Tourism, including Heritage Objectives

Annex 1.5_Model_Project_sheet_Leisure_Centres_School_camps

Annex 2.1_Grid Selection and prioritization Road infrastructure of county interest, including detours

Annex 2.2_Grid Selection and prioritization Urban mobility

Annex 2.3_Urban Regeneration Selection and Prioritization Grid

Annex 2.4_Tourism Selection and Prioritization Grid, including Heritage Objectives

Annex 2.5_Selection and prioritization grid Leisure centers_School_camps

Annex 3- Budget justification

Achievement and result indicators for projects financed from the European Regional Development Fund (ERDF) and the Cohesion Fund (version in English).

Previous Post
CORRIGENDUM – Methodology for the selection of project files submitted for the preparation of technical-economic documentation
Next Post
Between August 5 and 7, 2020, 5 new financing contracts were signed through the 2014-2020 ROP in the Northwest Development Region, as follows:
Menu
Skip to content